Waller ~32 acres — working conversation pack

26086 El Indio Rd · CAD 12542 (30.15 ac) + 12543 (2.0 ac house) = 32.1527 ac · Planning only — not legal, tax, or brokerage advice. Host target: https://waller.not4theweary.cloud/ (CF Access).

Ken’s take (for Lisa)

6-month MVP LOCKED

Window: 2026-09-13 → 2027-03-13. Both must be true by the end date:

  1. Sale of the first plat/tract closed (first deeded land piece under S2 carve or S3 platted lot — counsel locks which).
  2. Lisa in NY.

Mortgage rule (LOCKED): If Plan 1a happens or S2/S3 is initiated → payoff ~$72k (not partial-release as the working path).

Owners: all card owners stay TBD until Ken/Lisa claim them — do not invent assignees.

Side-by-side

PathGross (plan)Prep / workCountyCash timingStatus
1 · Whole packageList $1.4MM / ~$1.2MM bring-in≤$35k prepNoneList 3/15/2027 → hope summer 2027OUT
1a / 1bBandera $1.75MM · Waller $1.8MMList as investmentn/a (list)Opportunistic; don’t expectDual list
2 · One 10+ first$65k/ac OF (10ac→$650k) then ~$800k house+22 ≈ $1.45MMSurvey / lightAim >10 exemptPrefer 10+ in 2026; rem. 2027Easier path
3 · Four ~8s$1.8MM (400/500/450/450)Full plat + 4 salesFull platSE26 OF → house27 → SW28 OF → N29 OFPreferred*

*Preferred in planning; attorney-gated before lock. Basis SoT (Ken): $265k. Only lien: mortgage ~$72k.

Scenario 1 — Whole package OUT

Kept for context. Hierarchy: not the path at the prior whole-package framing.

Plan 1a / 1b — Dual investment list

Agreed in principle (Lisa conversation). Opportunistic — do not expect either to sell at ask; if one does → consolidate onto the unsold property, hold ~2 years, then sell the rest.

Plan 1aPlan 1b
PropertyBandera (homestead context)Waller ~32.15 ac
Ask$1.75MM$1.8MM
PositioningInvestment opportunity
Near-ask sweetenerWilling to cover 3% buyer-side if offer near ask

If 1a / 1b interacts with S2/S3

Scenario 2 — One 10+ first Easier row to hoe

Carve / sell one ≥10 ac tract (OF preferred); hold remainder ~20+ with house for later.

Phase 1 — 10+ (prefer 2026)

  • Candidates: southern-most E–W or eastern-most N–S strip
  • Ask (LOCKED 2026-09-13): $65k per acre (10.0 ac → $650k; scales with acres)
  • OF: 25% down · 8.1% (maybe prime) · cash buyout OK · term flexible
  • At $650k: down $162,500 · financed $487,500
  • County: aim §232.0015(f)-style all-lots>10 / no new public streets — confirm County Engineer

P&I @ 8.1% on $487.5k — 5yr ~$9.9k/mo is a hard pill; longer terms:

TermP&I / moP&I / yrNotes
5 years~$9,908~$119kPrior working · hard pill
7 years~$7,623~$91k
10 years~$5,941~$71kWorking display
15 years~$4,687~$56k
20 years~$4,108~$49k
30 years~$3,611~$43k
  • Longer term = lower monthly, more total interest (ordinary). RMLO/counsel before advertising a term.

Phase 2 — House + ~22 (2027)

  • ~$800k lump-sum (not OF)
  • Broker unless right buyer (not FSBO default)
  • Stack with Phase 1 ≈ $1.45MM ($650k + $800k at 10 ac)

Pros / cons (short)

Scenario 3 — Four ~8-ac hybrid PREFERRED*

Ken’s aha: plat/subdivision rigamarole is worth it — staged cash + multi-year income beat “no hoops.” *Attorney gate before lock.

Sell-down (baseline — holds until 1a sells)

YearTractHowPlan price
2026SE ~8 (empty)OF$400,000
2027Mid ~8 with houseLump (broker unless perfect buyer)$500,000
2028SW ~8 with trailer (conveys)OF$450,000
2029North ~8 (last)OF$450,000
Stack$1,800,000

OF working card: 25% / 5y / 8.1% (ask a bit more + thicker down OK). Cash buyout welcome on any tract. Overlapping notes cover 2026–2033.

CloseCash at closeP&INote years
2026 SE $400k$100,000~$6,097/mo2026–2030
2027 house $500k$500,000 lump——
2028 SW $450k$112,500~$6,859/mo2028–2032
2029 north $450k$112,500~$6,859/mo2029–2033

County / process (why it’s heavier)

  1. Full Waller County plat (lots ~8 — no >10 exemption)
  2. Survey + four legals; private driveways preferred (no new public streets)
  3. Plat clock vs first land close — critical path
  4. Payoff ~$72k when S2/S3 initiates (LOCKED) · RMLO + title for OF years
  5. 2028 MH conveys with SW · 2027 house still needs ≤$35k prep + dogs out

Hybrid map sketch

N~8 / Mid~8 (house + circle drive) / SW~8 (MH) / SE~8 · file assets/hybrid-n8.png

Normal size default · Zoom/+ grows the frame (page scroll) · click image for lightbox
Waller hybrid carve: North ~8, Mid ~8 with house, SW ~8 with MH, SE ~8
Normal size by default. Zoom grows the frame with the image — scroll the page to see it. Click image for lightbox.

4-week sprint calendar

Themes are guides — pull FS cards into whichever sprint claims them. Slip OK inside the window; MVP date is not.

SprintDatesThemeExit check
S12026-09-13 → 2026-10-10Counsel + county + bids + payoff quote + RMLO/titleFS-01 booked; FS-02 done/dated; ≥1 surveyor bid path; payoff quote requested; title/RMLO started
S22026-10-11 → 2026-11-07Lock S2 vs S3; survey under contract (safe option); Lisa NY dates draftedCounsel posture; survey signed per authority; FS-06 draft dates
S32026-11-08 → 2026-12-05Survey field; plat or >10 legal in flight; OF packagingSurvey progress; title/RMLO named; prep scope sheet
S42026-12-06 → 2027-01-02County plat file (S3) or market first 10+ (S2); payoff fundingPlat submitted or first tract under contract path
S52027-01-03 → 2027-01-30Plat / buyer diligence; Lisa move logistics firmPlat advancing or OF under contract; Lisa travel booked
S62027-01-31 → 2027-02-27Close path first tract; Lisa move executionClear close date or recorded plat + buyer; move underway
S72027-02-28 → 2027-03-13MVP closeoutFirst tract closed + Lisa in NY

Board (parallelism)

FS-01 Attorney ───┬─ gates geometry / plat $
FS-02 County ─────┤
FS-03 Surveyor ───┤  (S1–S2)
FS-04 Payoff plan ┤
FS-05 RMLO/title ─┘
FS-06 Lisa NY ─────────── MVP by end of window
FS-07 Prep scope ── after NY dates exist
→ First plat/tract CLOSE ─ MVP by 2027-03-13
CardEarliest sprintNotes
FS-01 AttorneyS1Gates geometry
FS-02 County pre-appS1Parallel with FS-01
FS-03 Surveyor bidsS1–S2Prefer Option C early
FS-04 Mortgage payoffS1Quote early
FS-05 RMLO + titleS1–S2Before advertising OF terms
FS-06 Lisa NY calendarS1–S2 draft; done by S5–S6MVP: in NY by S7 end
FS-07 Prep scopeS2–S3Scope only until dogs/NY allow
First tract closeS6–S7MVP
Plat record (S3 only)S4–S6Before first platted deed

First-sprint cards (FS-01…07)

Deep cards from the 2026-09-13 pack. Expand a card for steps, scripts, outputs. Owner always TBD.

FS-01 — RE lawyer consult (S2 vs S3 gate) P0 hard gate Owner TBD
Depends on
None
Blocks
Signing surveyor for locked 4-lot plat; plat application; declaring S3 “the plan”
Enables
Honest FS-03 contract choice; post-sprint plat or >10 carve

Why: S3 preferred emotionally; S2 vs S3 not locked until counsel weighs plat cost/time vs >10 exemption, OF stacking, and 1a/1b. Wrong geometry = expensive mistake.

Inputs (before meeting)

  • Hybrid sketch + one-pager (N~8 / Mid~8 house+drive / SW~8 MH / SE~8)
  • CAD 12542/12543 · address 26086 El Indio Rd
  • Mortgage ~$72k · payoff-is-given rule
  • Plan 1a Bandera $1.75MM / 1b Waller $1.8MM · 3% buyer-side if near ask
  • Baseline S3 stack + S2 stack · OF posture (§453, rate maybe prime)
  • July 2025 Montgomery OF lessons (deed+note+DOT)

Agenda (force answers)

  1. S2: single >10 carve + remainder on §232.0015(f)-style path? Failure modes?
  2. S3: full plat four ~8s — months/fees; Commissioners Court; private drives only?
  3. Sequence: survey → plat-or-exempt → mortgage payoff → first deed/OF
  4. OF: RMLO for vacant land? Note+DOT; ≤3/12-mo; advertising before RMLO
  5. Access: easements if Mid keeps circle drive; SE/SW off El Indio / Reids Prairie
  6. Tax facts only (Ken owns IRS): §453 · §121 if 1a first → house→2029
  7. 1a/1b live list while carving — disclosure / marketing conflicts
  8. Spend authority: survey / county / payoff timing before vs after next meeting

Call script

“We’re planning either (A) one 10+ acre seller-financed carve then sell the rest, or (B) a full Waller County plat into four ~8 acre tracts with staged seller finance. Mortgage ~$72k will be paid off. We also may list Bandera and/or the whole Waller tract at high asks in parallel. Need counsel who does subdivision and seller-carry. Can you do a paid consult with a written recommendation on A vs B and a safe spend list?”

Done when

  • Engagement on file
  • Written: prefer S2 / prefer S3 / dual-track + why
  • OK or HOLD on: (a) four-lot survey (b) plat filing $ (c) >10 metes-bounds only
  • Tracker updated if hierarchy changes

Money: consult TBD — do not authorize plat application fees on this card.

FS-02 — County Engineer pre-app (both paths) P0 Owner TBD
Depends on
FS-01 preferred; not required for questions-only
Blocks
Credible YE 2026 timeline; S3 calendar

Why: Ask both S2 and S3 in one visit so you don’t burn two trips.

Questions — S2 (>10)

  1. Deed one tract >10 + remainder >10, no new public streets — does §232.0015(f) (or county equivalent) apply?
  2. Any filing / affidavit / “exemption plat” still required?
  3. Frontage / access for a landlocked remainder?
  4. Typical timeline buyer→deed for exempt split?

Questions — S3 (full plat ~8s)

  1. Prelim / final / Commissioners Court?
  2. Fees; deposits; review engineers
  3. Private drives / shared access without public ROW?
  4. Drainage, septic, utility letters for acreage lots?
  5. Realistic recordation if survey starts in 30–60 days?
  6. What would make YE 2026 first lot close impossible?

Done when

  • Named contact + date
  • Written checklist/fees for full plat
  • Written answer on >10 exemption (yes/no/conditions)
  • Best-guess recordation or first-sale timeline
FS-03 — Surveyor bids (geometry not locked) P0 Owner TBD

Why: Survey is critical path either way. Wrong locked geometry = redraw $ and delay.

OptionScopeWhen to sign
ABoundary + one 10+ carve (S2)After FS-01 leans S2
BFull four-lot plat packageAfter FS-01 leans S3
CBoundary + control + pins now; lot lines as change orderPreferred this sprint

RFP: price A/B/C separately; Waller plat experience required; house+drive in Mid; MH in SW; private drives; neighbor-aligned.

Done: ≥2 written bids · preferred firm · signed only per FS-01 authority.

FS-04 — Mortgage payoff plan (~$72k) P0 · GIVEN Owner TBD

Partial releases add lender timeline risk. Full payoff once is simpler. Ken rule: payoff given if 1a or S2/S3 initiate.

Timing options

  • T1: Payoff at first land closing from down / escrow
  • T2: Weeks before close if commitment requires
  • T3: When 1a funds if that hits first

Done: current payoff quote + good-through · chosen T1/T2/T3 + funding source · title/RMLO notified of payoff (not partial-release default).

FS-05 — RMLO + title for Waller OF P0 Owner TBD

Texas OF: RMLO takes application / negotiates terms; counsel drafts note/DOT/deed; title closes. Engage RMLO before marketing rate/down/payment.

Title shortlist (verify live)

  1. Capital Title of Texas — Waller — 936-310-0113
  2. University Title — Hempstead — 979-399-4090
  3. Stewart Title — Hempstead — 866-721-5117
  4. Bluebonnet Abstract — Brenham / Waller area — 979-353-2553

Done: primary + backup RMLO (NMLS) and title · operating one-pager · both affirm payoff path and capacity.

FS-06 — Lisa + dogs NY calendar P0 logistics Owner TBD

Dogs make remodel/cleanup ~10× harder. NY move unblocks prep and showings. MVP: Lisa in NY by end of 6-month window. Go-ahead already given.

  • Hard move dates on calendar
  • Dog transport plan confirmed
  • “After dogs out” work list
  • House accessible for contractors

Money: move/travel/dog separate from the $35k prep cap.

FS-07 — House prep ≤$35k — scope only P1 this sprint Owner TBD

Scope now; full spend waits until dogs/Lisa calendar allows. Does not block first raw-land OF. Cap $35k. Hire vs DIY claims = TBD.

Done: scope sheet Σ ≤ $35k · finish-date target · execute-after-dogs checklist · explicit exclusions. Trailer/MH cleanup is a later card (conveys with SW on S3).

Key tracker notes (summary)

Multica: card-ready — do not post unless Ken asks. Do not Multica-mutate from this rebuild.